Arcelor Mittal Ghent has a lot of residual heat, which is currently cooled down in order to discharge it in a canal or into the air. After an initial inventory and several calculations, a feasibility study was conducted to look at concrete possibilities for the local use of Arcelor Mittal's excess heat.